971 4 3547604

A revolution in current transformer testing. The CT Analyzer automatically determines all relevant current transformer values and compares the results with the selected standard. The device evaluates the current transformer as per the IEC or IEEE standard within seconds with the push of a button.

It facilitates fast and economical on-site testing and calibration of metering and protection current transformers. Manufacturers of current transformers, high voltage transformers and switchgear also use the CT Analyzer for tests during development and production.

The CT SB2 switch box is available as an accessory to the CT Analyzer for automated testing of current transformers with multiple taps, without the need for complex and time-consuming rewiring.
 

Key Features

  • Highest measurement accuracy: 0.02 % / 1 min when calibrating on site
  • Very small and lightweight (< 8kg), easy to transport for on-site testing
  • Automatic evaluation according to IEC and IEEE standards
  • Short commissioning times (duration of the automatic test < 1min)
  • Excellent workplace safety - Tests run at max. 120V
  • Integration into testing routines using Remote Interface Control

Applications

The following values can be determined using the CT Analyzer:

  • Accuracy of the ratio and phase angle, taking into consideration the nominal burden and connected burden
  • CT excitation and saturation
  • Burden impedance
  • Winding resistance
  • Saturated and non-saturated inductance
  • CT polarity

What we do

We are the specialist in oil and gas engineering,power transmission & distribution and mechanical,Electrical and plumbing(MEP).

Who we are

We believe in good business relation ship with our customer".Peacock offers servises in all engineering related fields.We also provide services in documentation,drafting,HR recruitment ,corporate training couses....etc

Why us

Well trained,well experienced and well motivated our human resource team will complete the task in a turnkey basis according to the satisfaction of the customer and the local authorities with in a time frame and under atmost safety and quality.No compromise will make on quality under any circumstances.

pcockengineers.com © 2015 | All rights reserved.
Designed by: Greenlemon